Bike trails · Toowong to Brisbane CBD, Brisbane

Bicentennial Bikeway Brisbane: Route, Length and Access Points

A 4.8 km off-road river path from Toowong to the CBD with separate lanes for bikes and walkers.

Bicentennial Bikeway Brisbane: Route, Length and Access Points

Photo: John Robert McPherson, CC BY-SA 4.0, via Wikimedia Commons

The Bicentennial Bikeway is an off-road path of about 4.8 km along the Brisbane River, running from Toowong to the Brisbane CBD with separate paths for bikes and pedestrians. It is one of the easiest ways to ride or walk into the city without sharing the road.

The path runs along the northern riverbank, passing Auchenflower and Milton alongside Coronation Drive, and reaches the CBD. Brisbane City Council says it suits walkers, cyclists and scooter riders of all ages and abilities.

Bicentennial Bikeway route

From the western end at Toowong, the path follows the river east through Auchenflower and Milton to the CBD. At the city end it joins paths to South Bank, Kangaroo Point and New Farm, so you can carry on across the river or to the east.

Two river crossings nearby have their own guides: Kurilpa Bridge and the Go Between Bridge.

A path with blue paving sloping down under trees beside the river
The bikeway connection near North Quay. Photo: John Robert McPherson, CC BY-SA 4.0, via Wikimedia Commons

What you will see along the way

The path has river views, with shade shelters and seating along the riverbank. State and council upgrades have added lighting, shade structures, landscaping, bike parking and signage over the years.

At the city end the route leads on to the Brisbane City Botanic Gardens and the dining at Howard Smith Wharves.

A curving path with a green bike lane beside a handrail and the river
Separate lanes for bikes and walkers along the river. Photo: John Robert McPherson, CC BY-SA 4.0, via Wikimedia Commons

History and upgrades

The bikeway has been upgraded in stages. Stage one, between Park Road and Little Cribb Street, was completed in September 2009. Stage two, officially opened in November 2010, added another 500 m of path, widened the shared pathway so pedestrians and cyclists are separated, and added lighting, shade structures, landscaping, bike parking and signage. The stage two upgrade cost $4.1 million and was part of a four-stage project.

After the 2022 floods the bikeway reopened once the State Government removed the Drift Restaurant, which had blocked a key section. Together with the City Reach Boardwalk and the City Botanic Gardens Riverwalk, it completed a route from Toowong to Howard Smith Wharves, and riders can continue to New Farm and Hamilton.

Where to join the path

The two ends are Toowong in the west and the CBD in the east. In between, the path runs through Auchenflower and Milton, and there is a connection at North Quay. If you are not riding the whole way, pick a section: a riverside walk from the city end is an easy start.

Longer rides from the bikeway

The bikeway works as the spine of a longer ride. From the city end, Council says paths lead on to South Bank, Kangaroo Point and New Farm, and the riverfront route continues to Hamilton.

That makes it a handy way to link a morning at South Bank Parklands or the City Botanic Gardens with a train or ferry home from Toowong.

Is the Bicentennial Bikeway good for families and walkers?

Yes. Walkers and riders have separate paths, so it is a calmer choice than a shared footpath. Council also allows e-scooters and e-skateboards on Brisbane’s bikeways, so watch for them.

The Toowong village guide covers where to eat at the western end.

A shade shelter and bench beside a handrail overlooking the river and a bridge
Shade and seating beside the river. Photo: John Robert McPherson, CC BY-SA 4.0, via Wikimedia Commons

Walking and riding safely

Stay on the path that matches how you are travelling: walkers on the pedestrian path and riders on the bike path. Council allows e-scooters and e-skateboards on Brisbane’s bikeways, so expect a mix of fast and slow traffic, especially at commute times. Council’s bikeway safety, signage and rules page has the full rules.

Planning your visit

  • How long: the path is about 4.8 km one way, or about 9.6 km out and back.
  • Cost: free.
  • What to bring: water, a helmet if you are riding, sun protection and a lock for the bike.
  • Rules: Brisbane City Council has a bikeway safety, signage and rules page.

Getting there

The western end is at Toowong. Toowong has both a train station (Translink T1 and T2 services) and the Regatta ferry terminal, so you can arrive by train or ferry; check Council’s bikeway map for the best way onto the path. Toowong is about 9 minutes by car from the CBD, about 5 km.

See Council’s Brisbane bikeways page and the bikeway map.

Nearby

You might also like

Quick answers

How long is the Bicentennial Bikeway?

About 4.8 km one way, from Toowong to the Brisbane CBD.

Where does the Bicentennial Bikeway start and finish?

It runs from Toowong to the Brisbane CBD, along the northern bank of the Brisbane River.

Can you walk the Bicentennial Bikeway?

Yes. Bikes and pedestrians have separate paths along the route.

Are e-scooters allowed on the Bicentennial Bikeway?

Brisbane City Council allows e-scooters and e-skateboards on Brisbane’s bikeways. Check its e-mobility page for the rules.

Where does the Bicentennial Bikeway connect to?

At the CBD it connects to paths to South Bank, Kangaroo Point and New Farm.

Share this place
Share this place

The newsletter

The weekend ahead, in your inbox

New places to go and what's on around South East Queensland. Unsubscribe any time.

On the map

Have you been? Leave a comment

Tell other readers what it was like, or share a tip. Your email address is never shown, and comments are checked before they appear.

0 Comments

Reply to this comment

Your email address will not be published. Required fields are marked *